wetering.png
back to use cases

Offgrid fast charging of building equipment

Offgrid fast charging of building equipment

Wetering worked on behalf of Maaskracht floodplain management on emergency measures for a project in the Municipality of Maastricht. Based on the shared ambition, the choice was made for emission-free excavation. An electric SANY Group crane was deployed, which was charged via a DC fast charger. Watermeln ๐Ÿ‰ โšก supplied the Hydrogen generator and advised on the set-up.

Together we achieved an innovative and sustainable solution!

wetering.png
20241028_162125 (1).jpg
DC charging